Triple

T16426078
Position Surface form Disambiguated ID Type / Status
Subject Northern vs Southern California rivalry E398945 entity
Predicate involvesInfrastructureIssue P29037 FINISHED
Object high-speed rail routing debates LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: high-speed rail routing debates | Statement: [Northern vs Southern California rivalry, involvesInfrastructureIssue, high-speed rail routing debates]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: involvesInfrastructureIssue
Context triple: [Northern vs Southern California rivalry, involvesInfrastructureIssue, high-speed rail routing debates]
  • A. hasInfrastructureConcern
    Indicates that an entity has a problem, risk, or issue related to infrastructure that requires attention or management.
  • B. involvesIssue chosen
    Indicates that an action, event, or entity is related to, concerns, or includes a particular issue.
  • C. usesInfrastructure
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • D. infrastructureNeed
    Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
  • E. infrastructureImpact
    Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f2b9024819085c20e52de95d583 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e328faa7448190a2606f1b37ea0a3d completed April 18, 2026, 6:47 a.m.
PD Predicate disambiguation batch_69e22701d2288190bf8676050758f172 completed April 17, 2026, 12:26 p.m.
Created at: April 10, 2026, 5:09 a.m.