Triple
T16426078
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Northern vs Southern California rivalry |
E398945
|
entity |
| Predicate | involvesInfrastructureIssue |
P29037
|
FINISHED |
| Object | high-speed rail routing debates |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: high-speed rail routing debates | Statement: [Northern vs Southern California rivalry, involvesInfrastructureIssue, high-speed rail routing debates]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: involvesInfrastructureIssue Context triple: [Northern vs Southern California rivalry, involvesInfrastructureIssue, high-speed rail routing debates]
-
A.
hasInfrastructureConcern
Indicates that an entity has a problem, risk, or issue related to infrastructure that requires attention or management.
-
B.
involvesIssue
chosen
Indicates that an action, event, or entity is related to, concerns, or includes a particular issue.
-
C.
usesInfrastructure
Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
-
D.
infrastructureNeed
Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
-
E.
infrastructureImpact
Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f2b9024819085c20e52de95d583 |
completed | April 10, 2026, 4:40 a.m. |
| NER | Named-entity recognition | batch_69e328faa7448190a2606f1b37ea0a3d |
completed | April 18, 2026, 6:47 a.m. |
| PD | Predicate disambiguation | batch_69e22701d2288190bf8676050758f172 |
completed | April 17, 2026, 12:26 p.m. |
Created at: April 10, 2026, 5:09 a.m.