Triple
T16403170
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gasson Hall |
E398349
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | landmark tower |
C8164
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: landmark tower Context triple: [Gasson Hall, instanceOf, landmark tower]
-
A.
urban landmark
chosen
An urban landmark is a prominent, easily recognizable feature within a city—such as a building, monument, or natural formation—that serves as a visual reference point and symbol of the area’s identity.
-
B.
gateway tower
A gateway tower is a tall, often monumental structure that marks and controls entry to a defined area, serving both as a passage point and a visual landmark.
-
C.
museum tower
A museum tower is a vertically oriented museum structure that combines exhibition spaces, observation areas, and cultural amenities across multiple stacked levels to maximize limited urban space and create a landmark presence.
-
D.
man_made_structure
A man_made_structure is any constructed physical entity or facility created by humans to serve functional, aesthetic, or protective purposes in the built environment.
-
E.
twin tower
A twin tower is one of a pair of closely positioned, usually identical or symmetrically designed tall structures that function together as a unified architectural or infrastructural complex.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f2950248190bc8ad9b9bebdc8c8 |
completed | April 10, 2026, 4:40 a.m. |
Created at: April 10, 2026, 5:09 a.m.