Triple
T16395205
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | DT2 train |
E398161
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Nuremberg U-Bahn rolling stock |
C37399
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Nuremberg U-Bahn rolling stock Context triple: [DT2 train, instanceOf, Nuremberg U-Bahn rolling stock]
-
A.
Nuremberg U-Bahn station
A Nuremberg U-Bahn station is an underground or partially underground public transit facility in Nuremberg, Germany, where passengers access, board, and transfer between Nuremberg U-Bahn trains and related services.
-
B.
Munich U-Bahn station
A Munich U-Bahn station is an underground or surface-level transit facility in Munich’s rapid transit network where passengers access, board, and transfer between U-Bahn trains.
-
C.
Hamburg U-Bahn station
A Hamburg U-Bahn station is a designated stop or terminal along Hamburg’s urban rapid transit network, providing platforms, access facilities, and passenger services for boarding and alighting U-Bahn trains.
-
D.
Berlin U-Bahn station
A Berlin U-Bahn station is an underground or elevated public transit facility in Berlin that serves as a stop for the city’s metro trains, providing passenger access, ticketing, and connections to other transport modes.
-
E.
Vienna U-Bahn line
A Vienna U-Bahn line is a specific rapid transit route within Vienna’s underground railway network, defined by its track alignment, served stations, operating schedule, and rolling stock.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f2950248190bc8ad9b9bebdc8c8 |
completed | April 10, 2026, 4:40 a.m. |
Created at: April 10, 2026, 5:08 a.m.