Triple

T16384896
Position Surface form Disambiguated ID Type / Status
Subject Southern Nuclear Operating Company E397895 entity
Predicate instanceOf P0 FINISHED
Object nuclear power plant operator C37384 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear power plant operator
Context triple: [Southern Nuclear Operating Company, instanceOf, nuclear power plant operator]
  • A. nuclear technician
    A nuclear technician is a professional who assists in the operation, monitoring, and maintenance of nuclear reactors and related equipment to ensure safe and efficient use of nuclear technology.
  • B. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • C. nuclear engineer
    A nuclear engineer is a professional who designs, develops, and manages systems and processes that harness nuclear energy and radiation for applications such as power generation, medicine, and industry while ensuring safety and regulatory compliance.
  • D. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • E. U.S. nuclear power plant operating license
    A U.S. nuclear power plant operating license is a formal authorization issued by the Nuclear Regulatory Commission that permits a specific facility to construct, operate, and maintain a nuclear reactor under defined safety, security, and environmental conditions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f2880b48190ae1a9673a3bbef80 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:08 a.m.