Triple

T16379671
Position Surface form Disambiguated ID Type / Status
Subject Hans Camenzind E397767 entity
Predicate designed P184 FINISHED
Object 555 timer IC E381582 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 555 timer IC | Statement: [Hans Camenzind, designed, 555 timer IC]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 555 timer IC
Context triple: [Hans Camenzind, designed, 555 timer IC]
  • A. 555 timer IC chosen
    The 555 timer IC is a widely used integrated circuit that provides precise timing, pulse generation, and oscillator functions in countless electronic circuits.
  • B. NE555 timer
    The NE555 timer is a widely used integrated circuit that provides precise timing, pulse generation, and oscillator functions in countless electronic circuits.
  • C. LM339
    The LM339 is a quad voltage comparator integrated circuit widely used in analog electronics for comparing input voltages and driving digital logic.
  • D. LM7805
    The LM7805 is a widely used linear voltage regulator integrated circuit that provides a fixed 5-volt output for powering electronic circuits.
  • E. LM324
    The LM324 is a widely used low-power quad operational amplifier integrated circuit designed for single-supply applications in analog signal processing.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f2880b48190ae1a9673a3bbef80 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e319da3c6c8190a9ccf744996c31e8 completed April 18, 2026, 5:42 a.m.
NED1 Entity disambiguation (via context triple) batch_6a003c55bba481909bca6cc17e1dfcf5 completed May 10, 2026, 8:05 a.m.
Created at: April 10, 2026, 5:08 a.m.