Triple

T16370691
Position Surface form Disambiguated ID Type / Status
Subject X-51A Waverider E397555 entity
Predicate instanceOf P0 FINISHED
Object experimental unmanned hypersonic aircraft C6075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: experimental unmanned hypersonic aircraft
Context triple: [X-51A Waverider, instanceOf, experimental unmanned hypersonic aircraft]
  • A. experimental aircraft chosen
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. rocket-powered aircraft
    A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
  • C. experimental aircraft program series
    A coordinated sequence of research and development efforts focused on designing, building, testing, and evaluating prototype aircraft to explore new aerospace technologies, performance capabilities, and operational concepts.
  • D. supersonic aircraft
    A supersonic aircraft is a high-speed airplane designed to travel faster than the speed of sound, typically using specialized aerodynamics and powerful jet engines to minimize drag and withstand intense aerodynamic forces.
  • E. nuclear-powered aircraft prototype
    A nuclear-powered aircraft prototype is an experimental aircraft design that uses a nuclear reactor as its primary energy source to generate thrust or power propulsion systems, aiming for extremely long endurance without refueling.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f2778dc8190aa95c7572db127e6 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:08 a.m.