Triple
T16352673
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ElecLink |
E397096
|
entity |
| Predicate | interconnectorCategory |
P24733
|
FINISHED |
| Object |
UK–continental Europe interconnector
The UK–continental Europe interconnector is a high-voltage power link that enables cross-border electricity transmission between the United Kingdom and mainland Europe, enhancing energy security and market integration.
|
E1208708
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: UK–continental Europe interconnector | Statement: [ElecLink, interconnectorCategory, UK–continental Europe interconnector]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: UK–continental Europe interconnector Context triple: [ElecLink, interconnectorCategory, UK–continental Europe interconnector]
-
A.
Channel Tunnel Rail Link
The Channel Tunnel Rail Link, officially known as High Speed 1, is the high-speed railway in the United Kingdom that connects London with the Channel Tunnel and onward services to continental Europe.
-
B.
Baltic power grid
The Baltic power grid is the interconnected electricity transmission network serving the Baltic states of Estonia, Latvia, and Lithuania, linking their power systems with neighboring regions.
-
C.
LGV Interconnexion Est
LGV Interconnexion Est is a high-speed railway line in the Île-de-France region that links several major French TGV routes and serves key hubs including Paris Charles de Gaulle Airport.
-
D.
Fehmarnbelt Tunnel
The Fehmarnbelt Tunnel is a planned immersed road and rail tunnel that will create a fixed link between Denmark and Germany across the Fehmarn Belt in the Baltic Sea.
-
E.
Sud Europe Atlantique high-speed line
The Sud Europe Atlantique high-speed line is a French high-speed railway connecting Tours and Bordeaux, forming a key segment of the TGV network toward southwestern France and Spain.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: UK–continental Europe interconnector Triple: [ElecLink, interconnectorCategory, UK–continental Europe interconnector]
Generated description
The UK–continental Europe interconnector is a high-voltage power link that enables cross-border electricity transmission between the United Kingdom and mainland Europe, enhancing energy security and market integration.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: UK–continental Europe interconnector Target entity description: The UK–continental Europe interconnector is a high-voltage power link that enables cross-border electricity transmission between the United Kingdom and mainland Europe, enhancing energy security and market integration.
-
A.
Channel Tunnel Rail Link
The Channel Tunnel Rail Link, officially known as High Speed 1, is the high-speed railway in the United Kingdom that connects London with the Channel Tunnel and onward services to continental Europe.
-
B.
Baltic power grid
The Baltic power grid is the interconnected electricity transmission network serving the Baltic states of Estonia, Latvia, and Lithuania, linking their power systems with neighboring regions.
-
C.
LGV Interconnexion Est
LGV Interconnexion Est is a high-speed railway line in the Île-de-France region that links several major French TGV routes and serves key hubs including Paris Charles de Gaulle Airport.
-
D.
Fehmarnbelt Tunnel
The Fehmarnbelt Tunnel is a planned immersed road and rail tunnel that will create a fixed link between Denmark and Germany across the Fehmarn Belt in the Baltic Sea.
-
E.
Sud Europe Atlantique high-speed line
The Sud Europe Atlantique high-speed line is a French high-speed railway connecting Tours and Bordeaux, forming a key segment of the TGV network toward southwestern France and Spain.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: interconnectorCategory Context triple: [ElecLink, interconnectorCategory, UK–continental Europe interconnector]
-
A.
interconnectionMethodToOtherGrids
Indicates the method or mechanism by which one grid is physically or operationally interconnected to other grids.
-
B.
gridInterconnection
chosen
Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
-
C.
interconnectionType
Indicates the specific kind or nature of relationship that links two or more entities together.
-
D.
gridConnectionCountry
Indicates that an entity’s electrical grid is connected to, or integrated with, the power grid of a specified country.
-
E.
electrificationTerminusOf
Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
- F. None of above.
Provenance (6 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f26864c819088365ca381a003c2 |
completed | April 10, 2026, 4:40 a.m. |
| NER | Named-entity recognition | batch_69e2faccab748190b11e0808e422f2ea |
completed | April 18, 2026, 3:30 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a002db6375c81908c64dbe2bc987b1a |
completed | May 10, 2026, 7:03 a.m. |
| NEDg | Description generation | batch_6a00304d7c888190a018d865eb51f0a0 |
completed | May 10, 2026, 7:14 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a00309ceba88190a982b439a1e72e78 |
completed | May 10, 2026, 7:15 a.m. |
| PD | Predicate disambiguation | batch_69e226f37ecc819082af58b29b4e39d1 |
completed | April 17, 2026, 12:26 p.m. |
Created at: April 10, 2026, 5:07 a.m.