Triple

T16352540
Position Surface form Disambiguated ID Type / Status
Subject Eurotunnel Shuttle terminals E397094 entity
Predicate instanceOf P0 FINISHED
Object transport terminal complex C82 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport terminal complex
Context triple: [Eurotunnel Shuttle terminals, instanceOf, transport terminal complex]
  • A. container terminal complex
    A container terminal complex is a large, integrated facility where containerized cargo is transferred between ships, trucks, and trains, supported by specialized infrastructure, equipment, and logistics services.
  • B. transport hub chosen
    A transport hub is a central location where multiple modes or routes of transportation intersect, enabling the efficient transfer of passengers or goods between them.
  • C. passenger rail terminal
    A passenger rail terminal is a dedicated facility where travelers board, disembark, and transfer between trains, supported by platforms, ticketing, waiting areas, and related passenger services.
  • D. terminal station
    A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
  • E. rapid transit station
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f26864c819088365ca381a003c2 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:07 a.m.