Triple

T16346145
Position Surface form Disambiguated ID Type / Status
Subject Road Development Authority of Sri Lanka E396935 entity
Predicate subOrganization P254 FINISHED
Object Bridge Design Division E1105297 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bridge Design Division | Statement: [Road Development Authority of Sri Lanka, subOrganization, Bridge Design Division]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bridge Design Division
Context triple: [Road Development Authority of Sri Lanka, subOrganization, Bridge Design Division]
  • A. Infrastructure Design and Construction division
    The Infrastructure Design and Construction division is a unit of San Francisco’s public works department responsible for planning, engineering, and delivering the city’s public infrastructure projects.
  • B. Building Design and Construction division
    The Building Design and Construction division is a unit within the San Francisco Department of Public Works responsible for planning, designing, and overseeing the construction and renovation of public buildings and facilities in the city.
  • C. División de Ingeniería
    La División de Ingeniería es una gran unidad especializada del Ejército de Chile encargada de las operaciones de ingeniería militar, incluyendo construcción, fortificación, apoyo a la movilidad y tareas de apoyo en emergencias.
  • D. Civil Infrastructure Division chosen
    The Civil Infrastructure Division is a specialized unit focused on planning, designing, and delivering large-scale public works and infrastructure projects such as roads, bridges, and utilities.
  • E. Civil Engineering Department
    The Civil Engineering Department is an academic unit specializing in the study and application of infrastructure design, construction, and maintenance within Samrat Ashok Technological Institute.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f26864c819088365ca381a003c2 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e2da0ec7e08190982a0de8ba5da105 completed April 18, 2026, 1:10 a.m.
NED1 Entity disambiguation (via context triple) batch_6a002db1cd288190a85fa2479369ef4f completed May 10, 2026, 7:03 a.m.
Created at: April 10, 2026, 5:07 a.m.