Triple
T16340095
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Crooked River |
E396773
|
entity |
| Predicate | nearbyFeature |
P2064
|
FINISHED |
| Object | Ochoco Reservoir |
E801656
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ochoco Reservoir | Statement: [Crooked River, nearbyFeature, Ochoco Reservoir]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ochoco Reservoir Context triple: [Crooked River, nearbyFeature, Ochoco Reservoir]
-
A.
Ochoco Reservoir
chosen
Ochoco Reservoir is a man-made lake in central Oregon popular for fishing, boating, and outdoor recreation near the city of Prineville.
-
B.
Squaw Creek Reservoir
Squaw Creek Reservoir is a man-made lake in Texas primarily known for serving as the cooling water source for the Comanche Peak Nuclear Power Plant.
-
C.
Ute Reservoir
Ute Reservoir is a man-made lake in eastern New Mexico that serves as a major regional water storage and recreation area.
-
D.
Wickiup Reservoir
Wickiup Reservoir is a large man-made lake in central Oregon known for its camping, boating, and especially trophy trout and kokanee fishing.
-
E.
Pueblo Reservoir
Pueblo Reservoir is a large man-made lake in southern Colorado that serves as a key water supply, recreation area, and flood-control resource for the Pueblo region.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f26864c819088365ca381a003c2 |
completed | April 10, 2026, 4:40 a.m. |
| NER | Named-entity recognition | batch_69e2da09dcf48190b6fdd14b1812c56a |
completed | April 18, 2026, 1:10 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0084a88dc08190a78973bc71f179d4 |
completed | May 10, 2026, 1:14 p.m. |
Created at: April 10, 2026, 5:07 a.m.