Triple
T16334622
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BART Orange Line |
E396644
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | BART line |
C641
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: BART line Context triple: [BART Orange Line, instanceOf, BART line]
-
A.
subway line
chosen
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
B.
tram line
A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
-
C.
commuter rail line
A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
-
D.
Pink Line station
A Pink Line station is a designated stop or terminal along a transit system’s Pink Line where passengers can board, alight, and transfer between services.
-
E.
rapid transit line segment
A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f255b788190a400eba031dd85d8 |
completed | April 10, 2026, 4:40 a.m. |
Created at: April 10, 2026, 5:07 a.m.