Triple

T16322959
Position Surface form Disambiguated ID Type / Status
Subject Dismaland E396343 entity
Predicate instanceOf P0 FINISHED
Object temporary art project C5509 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: temporary art project
Context triple: [Dismaland, instanceOf, temporary art project]
  • A. contemporary art project
    A contemporary art project is a time-bound, concept-driven artistic endeavor that uses current ideas, media, and contexts to explore, question, or reframe cultural, social, or aesthetic issues.
  • B. temporary structure chosen
    A temporary structure is a short-term physical construction erected for a limited duration to serve a specific, often transitional, purpose before being removed or replaced.
  • C. performance art project
    A performance art project is a time-based artistic endeavor in which an artist or group stages live actions, gestures, or events—often blending theater, visual art, and audience interaction—to explore concepts, provoke reflection, or challenge social and aesthetic norms.
  • D. temporary city
    A temporary city is a short-lived, purpose-built urban environment that provides essential infrastructure, services, and social spaces for a limited time before being dismantled or abandoned.
  • E. public art installation series
    A public art installation series is a curated sequence of site-specific artworks displayed in shared communal spaces over time, designed to engage diverse audiences and provoke reflection, dialogue, or interaction within the public realm.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f255b788190a400eba031dd85d8 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:06 a.m.