Triple

T16311790
Position Surface form Disambiguated ID Type / Status
Subject Bill & Melinda Gates Foundation campus in Seattle E396074 entity
Predicate instanceOf P0 FINISHED
Object sustainably designed building C20840 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sustainably designed building
Context triple: [Bill & Melinda Gates Foundation campus in Seattle, instanceOf, sustainably designed building]
  • A. sustainable design project chosen
    A sustainable design project is an initiative that plans, develops, and implements solutions minimizing environmental impact while balancing social responsibility and economic viability throughout a product, service, or system’s life cycle.
  • B. green building certification system
    A green building certification system is a standardized framework that evaluates and rates buildings based on their environmental performance, resource efficiency, and sustainability practices throughout design, construction, and operation.
  • C. building envelope
    The building envelope is the physical barrier between the interior and exterior of a building, including walls, roofs, windows, doors, and foundations, that controls the flow of heat, air, moisture, and light.
  • D. organic architecture
    Organic architecture is a design philosophy that promotes harmony between human habitation and the natural world through forms, materials, and layouts that are inspired by and integrated with the surrounding environment.
  • E. architectural design
    Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f23bb088190a16fbb91a1957ea5 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:06 a.m.