Triple

T16309112
Position Surface form Disambiguated ID Type / Status
Subject Green Line southern extension E396000 entity
Predicate instanceOf P0 FINISHED
Object Washington Metro expansion project C24427 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Washington Metro expansion project
Context triple: [Green Line southern extension, instanceOf, Washington Metro expansion project]
  • A. MBTA Red Line extension project
    The MBTA Red Line extension project is a planned expansion of Boston’s Red Line rapid transit service, extending rail infrastructure and stations to improve regional connectivity, capacity, and access to public transportation.
  • B. New York City Subway infrastructure project
    A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
  • C. Los Angeles Metro project
    The Los Angeles Metro project is a large-scale public transportation initiative focused on expanding and improving the region’s rail and bus networks to enhance mobility, reduce congestion, and support sustainable urban growth across Los Angeles County.
  • D. Long Island Rail Road project
    A Long Island Rail Road project is a coordinated initiative to plan, construct, upgrade, or maintain LIRR infrastructure, services, or operations to improve rail transportation for its riders and communities.
  • E. subway line extension chosen
    A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f23bb088190a16fbb91a1957ea5 completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:06 a.m.