Triple
T16308372
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Володарский мост |
E395979
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | автомобильный мост |
C31837
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: автомобильный мост Context triple: [Володарский мост, instanceOf, автомобильный мост]
-
A.
movable bridge
A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
-
B.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
C.
multipurpose bridge
A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
-
D.
bridge operator
A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
-
E.
road and rail bridge
chosen
A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f23bb088190a16fbb91a1957ea5 |
completed | April 10, 2026, 4:40 a.m. |
Created at: April 10, 2026, 5:06 a.m.