Triple

T16307838
Position Surface form Disambiguated ID Type / Status
Subject European Synchrotron Radiation Facility E395967 entity
Predicate EBSCompletion P63674 FINISHED
Object 2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [European Synchrotron Radiation Facility, EBSCompletion, 2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: EBSCompletion
Context triple: [European Synchrotron Radiation Facility, EBSCompletion, 2020]
  • A. closureCompleted
    Indicates that a previously initiated closure process or shutdown has been fully and successfully completed.
  • B. electronicCompletion
    Indicates that an action, process, or transaction has been fully completed through electronic or digital means rather than physically or manually.
  • C. isCompleteOn chosen
    Indicates that an activity, task, or process has been fully finished or achieved by a specific point in time or on a specific date.
  • D. isComplete
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • E. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f23bb088190a16fbb91a1957ea5 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e288d776808190a7c9918477f07216 completed April 17, 2026, 7:24 p.m.
PD Predicate disambiguation batch_69e219fa5508819097e9d383348bf174 completed April 17, 2026, 11:31 a.m.
Created at: April 10, 2026, 5:06 a.m.