Triple

T16303225
Position Surface form Disambiguated ID Type / Status
Subject H-II Transfer Vehicle E395840 entity
Predicate missionSuccessRate P7192 FINISHED
Object 100% LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 100% | Statement: [H-II Transfer Vehicle, missionSuccessRate, 100%]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: missionSuccessRate
Context triple: [H-II Transfer Vehicle, missionSuccessRate, 100%]
  • A. successRate chosen
    Indicates the proportion or frequency with which attempts at a given action or process result in a successful outcome.
  • B. missionOutcome
    Indicates the result or consequence of a mission, specifying whether and how the mission’s objectives were achieved or failed.
  • C. numberOfSuccessfulMissions
    Indicates the count of missions that have been completed successfully by the referenced entity or within the specified context.
  • D. successMetric
    Indicates the specific criterion or measure used to evaluate whether an action, process, or relationship has achieved its intended success.
  • E. completionRate
    Indicates the proportion of a task, process, or set of items that has been finished relative to its total intended amount.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f23bb088190a16fbb91a1957ea5 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e25e35157481909e5604b7dae7a2a2 completed April 17, 2026, 4:22 p.m.
PD Predicate disambiguation batch_69e219fa5508819097e9d383348bf174 completed April 17, 2026, 11:31 a.m.
Created at: April 10, 2026, 5:06 a.m.