Triple
T16303225
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | H-II Transfer Vehicle |
E395840
|
entity |
| Predicate | missionSuccessRate |
P7192
|
FINISHED |
| Object | 100% |
—
|
LITERAL FINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: missionSuccessRate Context triple: [H-II Transfer Vehicle, missionSuccessRate, 100%]
-
A.
successRate
chosen
Indicates the proportion or frequency with which attempts at a given action or process result in a successful outcome.
-
B.
missionOutcome
Indicates the result or consequence of a mission, specifying whether and how the mission’s objectives were achieved or failed.
-
C.
numberOfSuccessfulMissions
Indicates the count of missions that have been completed successfully by the referenced entity or within the specified context.
-
D.
successMetric
Indicates the specific criterion or measure used to evaluate whether an action, process, or relationship has achieved its intended success.
-
E.
completionRate
Indicates the proportion of a task, process, or set of items that has been finished relative to its total intended amount.
- F. None of above.
Provenance (3 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69d87f23bb088190a16fbb91a1957ea5 |
elicitation | completed |
| NER | batch_69e25e35157481909e5604b7dae7a2a2 |
ner | completed |
| PD | batch_69e219fa5508819097e9d383348bf174 |
pd | completed |
Created at: April 10, 2026, 5:06 a.m.