Triple

T16301697
Position Surface form Disambiguated ID Type / Status
Subject Zimbabwe and Mozambique E395804 entity
Predicate shareInfrastructureCorridor P59961 FINISHED
Object Beira Corridor E336969 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Beira Corridor | Statement: [Zimbabwe and Mozambique, shareInfrastructureCorridor, Beira Corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Beira Corridor
Context triple: [Zimbabwe and Mozambique, shareInfrastructureCorridor, Beira Corridor]
  • A. Beira Corridor chosen
    The Beira Corridor is a key transport route in southeastern Africa that links landlocked countries such as Zimbabwe, Zambia, and Malawi to the Indian Ocean via the port city of Beira in Mozambique.
  • B. Linha do Vouga corridor
    The Linha do Vouga corridor is a narrow-gauge railway line in Portugal that connects several interior towns in the Vouga River region and is served by regional passenger trains.
  • C. Beira Alta railway corridor
    The Beira Alta railway corridor is a key rail route in Portugal that connects the interior Beira Alta region with major national and international lines, serving as an important axis for both passenger and freight transport.
  • D. Rua da Figueira da Foz
    Rua da Figueira da Foz is a street in Coimbra, Portugal, situated along the route of the historic Aqueduto de São Sebastião.
  • E. Linha da Beira Alta
    Linha da Beira Alta is a major Portuguese railway line that serves as a key international freight and passenger corridor linking central Portugal to Spain and the rest of Europe.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: shareInfrastructureCorridor
Context triple: [Zimbabwe and Mozambique, shareInfrastructureCorridor, Beira Corridor]
  • A. shareEconomicCorridor
    Indicates that two or more entities are connected by, or participate in, the same economic corridor for trade, transport, or development activities.
  • B. shareTransportInfrastructure chosen
    Indicates that multiple entities make joint use of the same transport infrastructure facilities or systems.
  • C. parallelTransportCorridor
    Indicates a relationship where one path, route, or connection is used to transport something in a way that preserves its structure or configuration relative to another, typically along a shared or corresponding trajectory.
  • D. transportCorridor
    Indicates a route or pathway used to move people, goods, or resources between locations.
  • E. partOfEconomicCorridor
    Indicates that one entity is included within, or constitutes a segment of, a larger defined economic corridor.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f23bb088190a16fbb91a1957ea5 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e25e32da7081908d8bd320374a5731 completed April 17, 2026, 4:22 p.m.
NED1 Entity disambiguation (via context triple) batch_6a001f9fb2908190a8521b1ccf49170a completed May 10, 2026, 6:03 a.m.
PD Predicate disambiguation batch_69e219fa5508819097e9d383348bf174 completed April 17, 2026, 11:31 a.m.
Created at: April 10, 2026, 5:06 a.m.