Triple
T16301697
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zimbabwe and Mozambique |
E395804
|
entity |
| Predicate | shareInfrastructureCorridor |
P59961
|
FINISHED |
| Object | Beira Corridor |
E336969
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Beira Corridor | Statement: [Zimbabwe and Mozambique, shareInfrastructureCorridor, Beira Corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Beira Corridor Context triple: [Zimbabwe and Mozambique, shareInfrastructureCorridor, Beira Corridor]
-
A.
Beira Corridor
chosen
The Beira Corridor is a key transport route in southeastern Africa that links landlocked countries such as Zimbabwe, Zambia, and Malawi to the Indian Ocean via the port city of Beira in Mozambique.
-
B.
Linha do Vouga corridor
The Linha do Vouga corridor is a narrow-gauge railway line in Portugal that connects several interior towns in the Vouga River region and is served by regional passenger trains.
-
C.
Beira Alta railway corridor
The Beira Alta railway corridor is a key rail route in Portugal that connects the interior Beira Alta region with major national and international lines, serving as an important axis for both passenger and freight transport.
-
D.
Rua da Figueira da Foz
Rua da Figueira da Foz is a street in Coimbra, Portugal, situated along the route of the historic Aqueduto de São Sebastião.
-
E.
Linha da Beira Alta
Linha da Beira Alta is a major Portuguese railway line that serves as a key international freight and passenger corridor linking central Portugal to Spain and the rest of Europe.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: shareInfrastructureCorridor Context triple: [Zimbabwe and Mozambique, shareInfrastructureCorridor, Beira Corridor]
-
A.
shareEconomicCorridor
Indicates that two or more entities are connected by, or participate in, the same economic corridor for trade, transport, or development activities.
-
B.
shareTransportInfrastructure
chosen
Indicates that multiple entities make joint use of the same transport infrastructure facilities or systems.
-
C.
parallelTransportCorridor
Indicates a relationship where one path, route, or connection is used to transport something in a way that preserves its structure or configuration relative to another, typically along a shared or corresponding trajectory.
-
D.
transportCorridor
Indicates a route or pathway used to move people, goods, or resources between locations.
-
E.
partOfEconomicCorridor
Indicates that one entity is included within, or constitutes a segment of, a larger defined economic corridor.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f23bb088190a16fbb91a1957ea5 |
completed | April 10, 2026, 4:40 a.m. |
| NER | Named-entity recognition | batch_69e25e32da7081908d8bd320374a5731 |
completed | April 17, 2026, 4:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a001f9fb2908190a8521b1ccf49170a |
completed | May 10, 2026, 6:03 a.m. |
| PD | Predicate disambiguation | batch_69e219fa5508819097e9d383348bf174 |
completed | April 17, 2026, 11:31 a.m. |
Created at: April 10, 2026, 5:06 a.m.