Triple

T16295076
Position Surface form Disambiguated ID Type / Status
Subject Clear Creek trail system E395626 entity
Predicate instanceOf P0 FINISHED
Object multi-use path network C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multi-use path network
Context triple: [Clear Creek trail system, instanceOf, multi-use path network]
  • A. pedestrian network
    A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
  • B. network of escape routes
    A network of escape routes is an interconnected system of planned pathways and exits designed to enable rapid, safe evacuation from a space or situation under emergency conditions.
  • C. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • D. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • E. tourist route network
    A tourist route network is an interconnected system of paths, attractions, and services designed to guide visitors efficiently and enjoyably through a region’s key points of interest.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f22c7248190a54c949738441e2e completed April 10, 2026, 4:40 a.m.
Created at: April 10, 2026, 5:05 a.m.