Triple
T16283062
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tokyo 2020 Paralympic opening ceremony |
E395317
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Paralympic Games opening ceremony |
C28679
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Paralympic Games opening ceremony Context triple: [Tokyo 2020 Paralympic opening ceremony, instanceOf, Paralympic Games opening ceremony]
-
A.
paralympic closing ceremony
A Paralympic closing ceremony is the celebratory event that marks the end of the Paralympic Games, featuring cultural performances, athlete recognition, and the official handover to the next host city.
-
B.
Paralympic Games
The Paralympic Games are a major international multi-sport event where athletes with a range of physical, visual, and intellectual impairments compete at the elite level, typically held shortly after and in the same host city as the Olympic Games.
-
C.
sports opening ceremony
chosen
A sports opening ceremony is a planned, often spectacular event that marks the official start of a sporting competition or tournament through performances, rituals, and formal presentations.
-
D.
Paralympic Games motto
The Paralympic Games motto is a concise, inspirational phrase that encapsulates the core values, spirit, and aspirations of the Paralympic Movement and its athletes.
-
E.
Winter Paralympic Games
The Winter Paralympic Games are an international multi-sport event held every four years, featuring winter sports competitions for athletes with physical, visual, and intellectual impairments, organized in parallel with the Olympic Winter Games.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f22c7248190a54c949738441e2e |
completed | April 10, 2026, 4:40 a.m. |
Created at: April 10, 2026, 5:05 a.m.