Triple

T16272990
Position Surface form Disambiguated ID Type / Status
Subject Port Qasim Coal Power Project E395047 entity
Predicate gridConnection P845 FINISHED
Object Pakistan national grid E533680 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pakistan national grid | Statement: [Port Qasim Coal Power Project, gridConnection, Pakistan national grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pakistan national grid
Context triple: [Port Qasim Coal Power Project, gridConnection, Pakistan national grid]
  • A. Pakistan national power grid chosen
    The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
  • B. Iran national power grid
    The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
  • C. Pakistan Railways network
    The Pakistan Railways network is the state-owned national railway system of Pakistan, encompassing an extensive web of passenger and freight lines that connect major cities, industrial centers, and border regions across the country.
  • D. Afghanistan national power system
    The Afghanistan national power system is the country’s interconnected electricity generation, transmission, and distribution network that supplies power to homes, businesses, and industries across Afghanistan.
  • E. Indian national grid
    The Indian national grid is the countrywide interconnected power transmission network that enables electricity generated across India to be distributed reliably and efficiently to consumers in all regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f221d8081909b0b2063e7528ba2 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e2460b22d88190bdc7cf509cf74198 completed April 17, 2026, 2:39 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0017c0ef4c8190b44ac84f71b2ed41 completed May 10, 2026, 5:29 a.m.
Created at: April 10, 2026, 5:05 a.m.