Triple

T16231076
Position Surface form Disambiguated ID Type / Status
Subject Ray Brown Trio E393979 entity
Predicate notableWork P4 FINISHED
Object Soular Energy E387144 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Soular Energy | Statement: [Ray Brown Trio, notableWork, Soular Energy]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Soular Energy
Context triple: [Ray Brown Trio, notableWork, Soular Energy]
  • A. Soular Energy chosen
    Soular Energy is a highly acclaimed jazz album by bassist Ray Brown, celebrated for its swinging trio performances and exemplary straight-ahead jazz style.
  • B. Helion Energy
    Helion Energy is a private American nuclear fusion company focused on developing commercial fusion power technology as a clean, scalable energy source.
  • C. GenOn Energy
    GenOn Energy was a major U.S. power generation company that operated a large fleet of fossil-fuel power plants before being absorbed into NRG Energy.
  • D. Akfen Renewable Energy
    Akfen Renewable Energy is a Turkish company focused on developing and operating renewable power generation projects such as wind, solar, and hydroelectric plants.
  • E. SolarWorld (historically)
    SolarWorld was a major solar panel manufacturing company that once operated one of the largest solar production facilities in Hillsboro, Oregon, and was a significant employer in the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f204df88190a8f88923decf9835 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e23d29fa248190943f4c3f7808908b completed April 17, 2026, 2:01 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0007a0ab08819082aea4c312c9ffc7 completed May 10, 2026, 4:20 a.m.
Created at: April 10, 2026, 5:03 a.m.