Triple
T16224447
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hemisfair district |
E393808
|
entity |
| Predicate | hasRedevelopmentPhase |
P50758
|
FINISHED |
| Object |
Civic Park phase
Civic Park phase is a major redevelopment stage within San Antonio’s Hemisfair district focused on creating a central urban park and public gathering space.
|
E1200571
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Civic Park phase | Statement: [Hemisfair district, hasRedevelopmentPhase, Civic Park phase]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Civic Park phase Context triple: [Hemisfair district, hasRedevelopmentPhase, Civic Park phase]
-
A.
Liberty Park redevelopment project
The Liberty Park redevelopment project is a large-scale initiative to transform Memphis’s historic Mid-South Fairgrounds into a modern mixed-use destination featuring sports, entertainment, and community amenities.
-
B.
Cityplaza Phase 2
Cityplaza Phase 2 is a major section of the Cityplaza shopping and office complex in Taikoo Shing, Hong Kong, featuring retail, dining, and commercial facilities.
-
C.
Cityplaza Phase 1
Cityplaza Phase 1 is a major section of the Cityplaza shopping and office complex in Hong Kong, featuring retail stores, dining outlets, and commercial space.
-
D.
Marina Park development
The Marina Park development is a major urban regeneration and public park project in Cork, Ireland, transforming the docklands and riverfront area around Páirc Uí Chaoimh into a large recreational and amenity space.
-
E.
Riverfront Recapture parks system
The Riverfront Recapture parks system is a network of interconnected parks and public spaces along the Connecticut River in the Hartford area, designed to revitalize the waterfront and provide recreational, cultural, and scenic amenities.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Civic Park phase Triple: [Hemisfair district, hasRedevelopmentPhase, Civic Park phase]
Generated description
Civic Park phase is a major redevelopment stage within San Antonio’s Hemisfair district focused on creating a central urban park and public gathering space.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Civic Park phase Target entity description: Civic Park phase is a major redevelopment stage within San Antonio’s Hemisfair district focused on creating a central urban park and public gathering space.
-
A.
Liberty Park redevelopment project
The Liberty Park redevelopment project is a large-scale initiative to transform Memphis’s historic Mid-South Fairgrounds into a modern mixed-use destination featuring sports, entertainment, and community amenities.
-
B.
Cityplaza Phase 2
Cityplaza Phase 2 is a major section of the Cityplaza shopping and office complex in Taikoo Shing, Hong Kong, featuring retail, dining, and commercial facilities.
-
C.
Cityplaza Phase 1
Cityplaza Phase 1 is a major section of the Cityplaza shopping and office complex in Hong Kong, featuring retail stores, dining outlets, and commercial space.
-
D.
Marina Park development
The Marina Park development is a major urban regeneration and public park project in Cork, Ireland, transforming the docklands and riverfront area around Páirc Uí Chaoimh into a large recreational and amenity space.
-
E.
Riverfront Recapture parks system
The Riverfront Recapture parks system is a network of interconnected parks and public spaces along the Connecticut River in the Hartford area, designed to revitalize the waterfront and provide recreational, cultural, and scenic amenities.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f204df88190a8f88923decf9835 |
completed | April 10, 2026, 4:40 a.m. |
| NER | Named-entity recognition | batch_69e23d24f9688190b670cfeb73332293 |
completed | April 17, 2026, 2:01 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a00079a5c1481909485e1b4a41f5d2c |
completed | May 10, 2026, 4:20 a.m. |
| NEDg | Description generation | batch_6a0008d53b6081908d66b2c09e8b2565 |
completed | May 10, 2026, 4:25 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a00096cabec81908fec25052e9cf4f8 |
completed | May 10, 2026, 4:28 a.m. |
Created at: April 10, 2026, 5:03 a.m.