Triple

T16224447
Position Surface form Disambiguated ID Type / Status
Subject Hemisfair district E393808 entity
Predicate hasRedevelopmentPhase P50758 FINISHED
Object Civic Park phase
Civic Park phase is a major redevelopment stage within San Antonio’s Hemisfair district focused on creating a central urban park and public gathering space.
E1200571 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Civic Park phase | Statement: [Hemisfair district, hasRedevelopmentPhase, Civic Park phase]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Civic Park phase
Context triple: [Hemisfair district, hasRedevelopmentPhase, Civic Park phase]
  • A. Liberty Park redevelopment project
    The Liberty Park redevelopment project is a large-scale initiative to transform Memphis’s historic Mid-South Fairgrounds into a modern mixed-use destination featuring sports, entertainment, and community amenities.
  • B. Cityplaza Phase 2
    Cityplaza Phase 2 is a major section of the Cityplaza shopping and office complex in Taikoo Shing, Hong Kong, featuring retail, dining, and commercial facilities.
  • C. Cityplaza Phase 1
    Cityplaza Phase 1 is a major section of the Cityplaza shopping and office complex in Hong Kong, featuring retail stores, dining outlets, and commercial space.
  • D. Marina Park development
    The Marina Park development is a major urban regeneration and public park project in Cork, Ireland, transforming the docklands and riverfront area around Páirc Uí Chaoimh into a large recreational and amenity space.
  • E. Riverfront Recapture parks system
    The Riverfront Recapture parks system is a network of interconnected parks and public spaces along the Connecticut River in the Hartford area, designed to revitalize the waterfront and provide recreational, cultural, and scenic amenities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Civic Park phase
Triple: [Hemisfair district, hasRedevelopmentPhase, Civic Park phase]
Generated description
Civic Park phase is a major redevelopment stage within San Antonio’s Hemisfair district focused on creating a central urban park and public gathering space.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Civic Park phase
Target entity description: Civic Park phase is a major redevelopment stage within San Antonio’s Hemisfair district focused on creating a central urban park and public gathering space.
  • A. Liberty Park redevelopment project
    The Liberty Park redevelopment project is a large-scale initiative to transform Memphis’s historic Mid-South Fairgrounds into a modern mixed-use destination featuring sports, entertainment, and community amenities.
  • B. Cityplaza Phase 2
    Cityplaza Phase 2 is a major section of the Cityplaza shopping and office complex in Taikoo Shing, Hong Kong, featuring retail, dining, and commercial facilities.
  • C. Cityplaza Phase 1
    Cityplaza Phase 1 is a major section of the Cityplaza shopping and office complex in Hong Kong, featuring retail stores, dining outlets, and commercial space.
  • D. Marina Park development
    The Marina Park development is a major urban regeneration and public park project in Cork, Ireland, transforming the docklands and riverfront area around Páirc Uí Chaoimh into a large recreational and amenity space.
  • E. Riverfront Recapture parks system
    The Riverfront Recapture parks system is a network of interconnected parks and public spaces along the Connecticut River in the Hartford area, designed to revitalize the waterfront and provide recreational, cultural, and scenic amenities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f204df88190a8f88923decf9835 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e23d24f9688190b670cfeb73332293 completed April 17, 2026, 2:01 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00079a5c1481909485e1b4a41f5d2c completed May 10, 2026, 4:20 a.m.
NEDg Description generation batch_6a0008d53b6081908d66b2c09e8b2565 completed May 10, 2026, 4:25 a.m.
NED2 Entity disambiguation (via description) batch_6a00096cabec81908fec25052e9cf4f8 completed May 10, 2026, 4:28 a.m.
Created at: April 10, 2026, 5:03 a.m.