Triple

T16198881
Position Surface form Disambiguated ID Type / Status
Subject Rapid Metro Gurgaon E393143 entity
Predicate instanceOf P0 FINISHED
Object light rapid transit system C31335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: light rapid transit system
Context triple: [Rapid Metro Gurgaon, instanceOf, light rapid transit system]
  • A. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • B. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • C. light metro chosen
    A light metro is a grade-separated, medium-capacity urban rail transit system that uses smaller trains and shorter headways than full-scale metros to efficiently serve moderate-demand corridors.
  • D. rapid rail system
    A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
  • E. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1e49ac8190a311b54d32990576 completed April 10, 2026, 4:39 a.m.
Created at: April 10, 2026, 5:03 a.m.