Triple
T16194311
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | American Car and Foundry |
E393022
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railroad equipment manufacturer |
C6408
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railroad equipment manufacturer Context triple: [American Car and Foundry, instanceOf, railroad equipment manufacturer]
-
A.
rail transport manufacturer
A rail transport manufacturer is a company that designs, engineers, and produces railway vehicles and related equipment such as locomotives, passenger cars, freight wagons, and signaling systems.
-
B.
rolling stock manufacturer
chosen
A rolling stock manufacturer is a company that designs, builds, and often maintains railway vehicles such as locomotives, passenger coaches, and freight wagons.
-
C.
freight railroad company
A freight railroad company is an organization that owns or operates rail infrastructure and rolling stock to transport goods and commodities by train between industrial, commercial, and logistics locations.
-
D.
rolling stock maintenance company
A rolling stock maintenance company is an organization that inspects, services, repairs, and overhauls railway vehicles such as locomotives, passenger coaches, and freight wagons to ensure their safety, reliability, and regulatory compliance.
-
E.
carriage manufacturer
A carriage manufacturer is a business or craftsman that designs, builds, and assembles horse-drawn vehicles for transportation or specialized use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f1e49ac8190a311b54d32990576 |
completed | April 10, 2026, 4:39 a.m. |
Created at: April 10, 2026, 5:02 a.m.