Triple

T16185006
Position Surface form Disambiguated ID Type / Status
Subject Matiari–Lahore HVDC transmission line E392777 entity
Predicate partOf P40 FINISHED
Object Pakistan national grid expansion E533680 NE FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pakistan national grid expansion
Context triple: [Matiari–Lahore HVDC transmission line, partOf, Pakistan national grid expansion]
  • A. Pakistan national power grid chosen
    The Pakistan national power grid is the countrywide high-voltage transmission network that distributes electricity from major generation sources, such as dams and power plants, to regional and local distribution systems across Pakistan.
  • B. Matiari–Lahore HVDC transmission line
    The Matiari–Lahore HVDC transmission line is a high-voltage direct current power transmission project in Pakistan that delivers electricity from southern generation hubs to demand centers in the north as part of the China–Pakistan Economic Corridor.
  • C. Afghanistan national power system
    The Afghanistan national power system is the country’s interconnected electricity generation, transmission, and distribution network that supplies power to homes, businesses, and industries across Afghanistan.
  • D. Iran national power grid
    The Iran national power grid is the nationwide interconnected electricity transmission and distribution network that supplies power across Iran from major generation sources such as dams, thermal plants, and other energy facilities.
  • E. Pakistan telecommunication networks
    Pakistan telecommunication networks is a major telecommunications provider in Pakistan, offering services such as mobile, fixed-line, and internet connectivity across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

Stage Batch ID Job type Status
creating batch_69d87f1e49ac8190a311b54d32990576 elicitation completed
NER batch_69e22060dcf88190b7c662946a5f0191 ner completed
NED1 batch_69ffff0550b48190ac84946b7254552b ned_source_triple completed
Created at: April 10, 2026, 5:02 a.m.