Triple

T16184991
Position Surface form Disambiguated ID Type / Status
Subject Matiari–Lahore HVDC transmission line E392777 entity
Predicate instanceOf P0 FINISHED
Object high-voltage direct current transmission line C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-voltage direct current transmission line
Context triple: [Matiari–Lahore HVDC transmission line, instanceOf, high-voltage direct current transmission line]
  • A. high-power DC fast charging system
    A high-power DC fast charging system is an electrical infrastructure that delivers large amounts of direct current at high voltage and current levels to rapidly recharge electric vehicle batteries, typically reducing charging times to minutes instead of hours.
  • B. electrified railway
    An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
  • C. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • D. third rail electrification system
    A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
  • E. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1e49ac8190a311b54d32990576 completed April 10, 2026, 4:39 a.m.
Created at: April 10, 2026, 5:02 a.m.