Triple

T1617708
Position Surface form Disambiguated ID Type / Status
Subject Columbia Accident Investigation Board E34756 entity
Predicate followedBy P78 FINISHED
Object Space Shuttle return-to-flight mission STS-114 E36506 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle return-to-flight mission STS-114 | Statement: [Columbia Accident Investigation Board, followedBy, Space Shuttle return-to-flight mission STS-114]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Space Shuttle return-to-flight mission STS-114
Context triple: [Columbia Accident Investigation Board, followedBy, Space Shuttle return-to-flight mission STS-114]
  • A. STS-114 chosen
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • B. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • C. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • D. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • E. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ffc5ec819091afa325d5f9611c completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a909addb348190a80a97422efcaa63 completed March 5, 2026, 4:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad51cf7b7c8190847ab6795fb5613b completed March 8, 2026, 10:39 a.m.
Created at: March 4, 2026, 7:28 p.m.