Triple
T1617708
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Columbia Accident Investigation Board |
E34756
|
entity |
| Predicate | followedBy |
P78
|
FINISHED |
| Object | Space Shuttle return-to-flight mission STS-114 |
E36506
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle return-to-flight mission STS-114 | Statement: [Columbia Accident Investigation Board, followedBy, Space Shuttle return-to-flight mission STS-114]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Space Shuttle return-to-flight mission STS-114 Context triple: [Columbia Accident Investigation Board, followedBy, Space Shuttle return-to-flight mission STS-114]
-
A.
STS-114
chosen
STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
-
B.
STS-109
STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
-
C.
STS-120
STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
-
D.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
E.
STS-135
STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885ffc5ec819091afa325d5f9611c |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69a909addb348190a80a97422efcaa63 |
completed | March 5, 2026, 4:42 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad51cf7b7c8190847ab6795fb5613b |
completed | March 8, 2026, 10:39 a.m. |
Created at: March 4, 2026, 7:28 p.m.