Triple

T16172070
Position Surface form Disambiguated ID Type / Status
Subject Watts Bar E392463 entity
Predicate locatedNear P294 FINISHED
Object Watts Bar Dam E93525 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Watts Bar Dam | Statement: [Watts Bar, locatedNear, Watts Bar Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Watts Bar Dam
Context triple: [Watts Bar, locatedNear, Watts Bar Dam]
  • A. Watts Bar Dam chosen
    Watts Bar Dam is a Tennessee Valley Authority hydroelectric and navigation dam on the Tennessee River in eastern Tennessee.
  • B. Wilson Dam
    Wilson Dam is a large hydroelectric and navigation dam in northern Alabama that forms part of the Tennessee Valley Authority system on the Tennessee River.
  • C. Watauga Dam
    Watauga Dam is a hydroelectric dam in northeastern Tennessee that impounds the Watauga River to provide power generation, flood control, and recreational opportunities in the Tennessee Valley region.
  • D. Old Hickory Dam
    Old Hickory Dam is a hydroelectric and navigation dam on the Cumberland River in Tennessee that creates Old Hickory Lake and helps control flooding and support regional water needs.
  • E. High Rock Dam
    High Rock Dam is a hydroelectric dam in North Carolina that impounds the Yadkin River to form High Rock Lake, a major reservoir for power generation and recreation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1d32208190942e4e499a80c18c completed April 10, 2026, 4:39 a.m.
NER Named-entity recognition batch_69e21eb7ab1481908fc35bfc8c56e5f2 completed April 17, 2026, 11:51 a.m.
NED1 Entity disambiguation (via context triple) batch_69fff7bd87f08190a9f2a1524e5db2ba completed May 10, 2026, 3:13 a.m.
Created at: April 10, 2026, 5:02 a.m.