Triple
T16152394
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alabama State Route 215 |
E391945
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object |
SR 215
SR 215 is a state highway in Alabama that serves as a primary route through the city of Tuscaloosa, connecting several major roads and local destinations.
|
E1200028
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 215 | Statement: [Alabama State Route 215, abbreviation, SR 215]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: SR 215 Context triple: [Alabama State Route 215, abbreviation, SR 215]
-
A.
SR 205
SR 205 is a state highway in Maine that serves as a short connector route within the state's regional road network.
-
B.
SR 21
SR 21 is a primary state highway in Alabama that runs north–south across the state, connecting several major towns and highways.
-
C.
SR 21
SR 21 is a Florida state highway that runs through the Jacksonville area, serving as a major north–south route connecting suburban communities and military installations.
-
D.
SR 219
SR 219 is a state highway in Alabama that serves as a regional connector route through several central and western counties.
-
E.
SR 219
SR 219 is a state highway in Georgia that serves as a regional connector route through west-central parts of the state.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 215 Triple: [Alabama State Route 215, abbreviation, SR 215]
Generated description
SR 215 is a state highway in Alabama that serves as a primary route through the city of Tuscaloosa, connecting several major roads and local destinations.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: SR 215 Target entity description: SR 215 is a state highway in Alabama that serves as a primary route through the city of Tuscaloosa, connecting several major roads and local destinations.
-
A.
SR 205
SR 205 is a state highway in Maine that serves as a short connector route within the state's regional road network.
-
B.
SR 21
SR 21 is a primary state highway in Alabama that runs north–south across the state, connecting several major towns and highways.
-
C.
SR 21
SR 21 is a Florida state highway that runs through the Jacksonville area, serving as a major north–south route connecting suburban communities and military installations.
-
D.
SR 219
SR 219 is a state highway in Alabama that serves as a regional connector route through several central and western counties.
-
E.
SR 219
SR 219 is a state highway in Georgia that serves as a regional connector route through west-central parts of the state.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f1c65e48190aa2b4c472e9bafc4 |
completed | April 10, 2026, 4:39 a.m. |
| NER | Named-entity recognition | batch_69e21d98d08c8190a15d4aee40d47220 |
completed | April 17, 2026, 11:46 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0007833960819088334e10258a9d72 |
completed | May 10, 2026, 4:20 a.m. |
| NEDg | Description generation | batch_6a0008c0a9488190837b655b8ef63a71 |
completed | May 10, 2026, 4:25 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a000911cc80819090fe9ee77b15e20c |
completed | May 10, 2026, 4:26 a.m. |
Created at: April 10, 2026, 5:01 a.m.