Triple
T16140247
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Calacuccia |
E391633
|
entity |
| Predicate | hasHydrologicalFeature |
P1094
|
FINISHED |
| Object |
Calacuccia Dam
Calacuccia Dam is a hydroelectric and water-storage dam located on the Golo River in Haute-Corse, Corsica, France.
|
E1196450
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Calacuccia Dam | Statement: [Calacuccia, hasHydrologicalFeature, Calacuccia Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Calacuccia Dam Context triple: [Calacuccia, hasHydrologicalFeature, Calacuccia Dam]
-
A.
Bassano Dam
Bassano Dam is a major irrigation and water-control structure on the Bow River in Alberta, Canada, supporting regional agriculture and water management.
-
B.
Calanda Dam
Calanda Dam is a hydroelectric dam in Switzerland associated with the Calanda mountain region, used primarily for water storage and power generation.
-
C.
Bargi Dam
Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
-
D.
Alicurá Dam
Alicurá Dam is a large hydroelectric dam in Argentina’s Patagonia region, known for forming the Alicurá Reservoir and generating power on the Limay River.
-
E.
La Torrassa Dam
La Torrassa Dam is a hydroelectric and water-regulation dam located on the Noguera Pallaresa River in the Catalan Pyrenees of Spain.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Calacuccia Dam Triple: [Calacuccia, hasHydrologicalFeature, Calacuccia Dam]
Generated description
Calacuccia Dam is a hydroelectric and water-storage dam located on the Golo River in Haute-Corse, Corsica, France.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Calacuccia Dam Target entity description: Calacuccia Dam is a hydroelectric and water-storage dam located on the Golo River in Haute-Corse, Corsica, France.
-
A.
Bassano Dam
Bassano Dam is a major irrigation and water-control structure on the Bow River in Alberta, Canada, supporting regional agriculture and water management.
-
B.
Calanda Dam
Calanda Dam is a hydroelectric dam in Switzerland associated with the Calanda mountain region, used primarily for water storage and power generation.
-
C.
Bargi Dam
Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
-
D.
Alicurá Dam
Alicurá Dam is a large hydroelectric dam in Argentina’s Patagonia region, known for forming the Alicurá Reservoir and generating power on the Limay River.
-
E.
La Torrassa Dam
La Torrassa Dam is a hydroelectric and water-regulation dam located on the Noguera Pallaresa River in the Catalan Pyrenees of Spain.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f1bb0988190b490d273dbf3fd03 |
completed | April 10, 2026, 4:39 a.m. |
| NER | Named-entity recognition | batch_69e21a07b7908190b4e1ec57f60a9274 |
completed | April 17, 2026, 11:31 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fff2b75988819094baaff8f53f48ce |
completed | May 10, 2026, 2:51 a.m. |
| NEDg | Description generation | batch_69fff36d39f48190bb48a1821f08664a |
completed | May 10, 2026, 2:54 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69fff3f2760c8190a58fedc2798614ae |
completed | May 10, 2026, 2:56 a.m. |
Created at: April 10, 2026, 5:01 a.m.