Triple

T16131949
Position Surface form Disambiguated ID Type / Status
Subject Elizabeth River Crossings E391419 entity
Predicate instanceOf P0 FINISHED
Object private infrastructure company C2979 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: private infrastructure company
Context triple: [Elizabeth River Crossings, instanceOf, private infrastructure company]
  • A. infrastructure management company chosen
    An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
  • B. infrastructure finance company
    An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
  • C. energy infrastructure company
    An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
  • D. private management company
    A private management company is a non-governmental organization that provides professional administrative, operational, and strategic management services to businesses, properties, or assets, typically for a fee.
  • E. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1bb0988190b490d273dbf3fd03 completed April 10, 2026, 4:39 a.m.
Created at: April 10, 2026, 5:01 a.m.