Triple
T16131949
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Elizabeth River Crossings |
E391419
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | private infrastructure company |
C2979
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: private infrastructure company Context triple: [Elizabeth River Crossings, instanceOf, private infrastructure company]
-
A.
infrastructure management company
chosen
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
-
B.
infrastructure finance company
An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
-
C.
energy infrastructure company
An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
-
D.
private management company
A private management company is a non-governmental organization that provides professional administrative, operational, and strategic management services to businesses, properties, or assets, typically for a fee.
-
E.
public utility company
A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f1bb0988190b490d273dbf3fd03 |
completed | April 10, 2026, 4:39 a.m. |
Created at: April 10, 2026, 5:01 a.m.