Triple

T16126703
Position Surface form Disambiguated ID Type / Status
Subject Taikazan E391290 entity
Predicate instanceOf P0 FINISHED
Object goal structure C11925 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: goal structure
Context triple: [Taikazan, instanceOf, goal structure]
  • A. long-term plan
    A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
  • B. structure
    A structure is an organized arrangement of interrelated components or elements designed to support, contain, or give form to something within a particular context.
  • C. milestone
    A milestone is a significant, measurable event or checkpoint in a project or process that marks progress toward a larger goal.
  • D. global development goal chosen
    A global development goal is a broad, long-term, internationally agreed objective aimed at improving human well-being and sustainable progress across countries.
  • E. design milestone
    A design milestone is a key checkpoint in the design process where specific deliverables are completed and reviewed to assess progress and guide subsequent work.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1bb0988190b490d273dbf3fd03 completed April 10, 2026, 4:39 a.m.
Created at: April 10, 2026, 5 a.m.