Triple
T16113509
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Takoma Park Historic District |
E390940
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | streetcar suburb |
C36995
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: streetcar suburb Context triple: [Takoma Park Historic District, instanceOf, streetcar suburb]
-
A.
streetcar corridor
A streetcar corridor is a designated urban transit route where streetcars operate along fixed tracks, typically integrated into city streets, to provide frequent, high-capacity public transportation and support adjacent mixed-use development.
-
B.
streetcar route
A streetcar route is a predefined path along public streets that streetcars follow to provide scheduled passenger transportation between specific stops or terminals.
-
C.
streetcar loop
A streetcar loop is a track configuration, often circular or balloon-shaped, that allows streetcars to turn around and reverse direction without needing to reverse their orientation.
-
D.
streetcar facility
A streetcar facility is a dedicated site that supports the operation, storage, maintenance, and dispatching of streetcars within a transit system.
-
E.
streetcar company
A streetcar company is an organization that owns, operates, and maintains streetcar systems to provide urban public transportation services along fixed rail routes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f1a8dd881909f1de6ef78849874 |
completed | April 10, 2026, 4:39 a.m. |
Created at: April 10, 2026, 5 a.m.