Triple
T16110255
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hammarby Sjöstad |
E390853
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sustainable urban development project |
C6939
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sustainable urban development project Context triple: [Hammarby Sjöstad, instanceOf, sustainable urban development project]
-
A.
sustainable urban development company
A sustainable urban development company plans, designs, and builds city spaces and infrastructure that minimize environmental impact, promote social equity, and support long-term economic resilience.
-
B.
urban design project
chosen
An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
-
C.
urban development
Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
-
D.
sustainable design project
A sustainable design project is an initiative that plans, develops, and implements solutions minimizing environmental impact while balancing social responsibility and economic viability throughout a product, service, or system’s life cycle.
-
E.
urban planning milestone
An urban planning milestone is a significant event, decision, or achievement that marks measurable progress in the development, implementation, or transformation of a city’s spatial, social, or infrastructural plans.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f1a8dd881909f1de6ef78849874 |
completed | April 10, 2026, 4:39 a.m. |
Created at: April 10, 2026, 5 a.m.