Triple
T16082810
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PopOdyssey Tour |
E390151
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | live concert production |
C26966
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: live concert production Context triple: [PopOdyssey Tour, instanceOf, live concert production]
-
A.
live music tour
A live music tour is a series of scheduled performances by an artist or band across multiple locations, typically organized to promote music releases, engage fans, and generate revenue through ticket and merchandise sales.
-
B.
live event production company
A live event production company plans, coordinates, and executes all technical and creative aspects of concerts, conferences, festivals, and other in-person experiences to deliver seamless, engaging events.
-
C.
live musical project
A live musical project is a performance-focused endeavor in which musicians present music in real time to an audience, often incorporating unique arrangements, improvisation, and collaborative elements distinct from studio recordings.
-
D.
rock concert
A rock concert is a live musical performance featuring rock bands or artists playing amplified instruments and vocals to an energetic audience, often accompanied by dynamic lighting and stage effects.
-
E.
live entertainment tour
chosen
A live entertainment tour is a series of scheduled performances by artists or productions traveling between multiple locations to present shows to in-person audiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d87f198bc48190a8b7e53ca15b7ead |
completed | April 10, 2026, 4:39 a.m. |
Created at: April 10, 2026, 4:59 a.m.