Triple

T16065424
Position Surface form Disambiguated ID Type / Status
Subject Wivenhoe Dam E389718 entity
Predicate floodCompartmentCapacity P42409 FINISHED
Object temporary flood storage above full supply level LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: temporary flood storage above full supply level | Statement: [Wivenhoe Dam, floodCompartmentCapacity, temporary flood storage above full supply level]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: floodCompartmentCapacity
Context triple: [Wivenhoe Dam, floodCompartmentCapacity, temporary flood storage above full supply level]
  • A. floodGauge
    Indicates that a device or measurement point is used to monitor and record the level or intensity of flooding at a specific location.
  • B. reservoirTotalCapacity chosen
    Indicates the maximum volume of water that a reservoir is designed to hold when full.
  • C. floodResistanceDesign
    Indicates that something is designed or engineered to withstand, mitigate, or remain functional during flooding conditions.
  • D. floodStage
    Indicates that a water body’s level has reached or exceeded the defined height at which flooding is expected to begin or become hazardous.
  • E. designedFloodLevel
    Indicates the flood level that a structure or system is specifically engineered to withstand or accommodate.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86daf32ec8190a8c0466c8f49c3c0 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e1858a00888190b8505071575dc56f completed April 17, 2026, 12:57 a.m.
PD Predicate disambiguation batch_69e18272f2288190a17d45fb01cc2b07 completed April 17, 2026, 12:44 a.m.
Created at: April 10, 2026, 4:57 a.m.