Triple

T16057887
Position Surface form Disambiguated ID Type / Status
Subject Melide–Bissone causeway E389529 entity
Predicate instanceOf P0 FINISHED
Object road–rail embankment C36902 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road–rail embankment
Context triple: [Melide–Bissone causeway, instanceOf, road–rail embankment]
  • A. combined road and rail bridge–tunnel
    A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
  • B. freight rail trench
    A freight rail trench is a sunken, often open-air corridor designed to carry freight trains below street level to reduce surface congestion, noise, and conflicts with other transportation modes.
  • C. road and rail bridge
    A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
  • D. railroad bridge
    A railroad bridge is a specialized structure that carries railway tracks over obstacles such as roads, rivers, valleys, or other rail lines, ensuring safe and continuous train passage.
  • E. railway bridge
    A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86dae698881908327ef2d67706cb9 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:57 a.m.