Triple

T16057810
Position Surface form Disambiguated ID Type / Status
Subject Cross-country Eliminator World Championships E389527 entity
Predicate instanceOf P0 FINISHED
Object UCI-sanctioned event C19805 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: UCI-sanctioned event
Context triple: [Cross-country Eliminator World Championships, instanceOf, UCI-sanctioned event]
  • A. UTMB World Series event
    A UTMB World Series event is a premier trail running race that forms part of the global UTMB circuit, offering standardized race categories, qualification opportunities for the UTMB World Series Finals, and a high-level competitive and experiential mountain running environment.
  • B. cycling event chosen
    A cycling event is an organized activity or competition in which participants ride bicycles over a designated course or distance, often under specific rules, categories, and timing.
  • C. IAAF Diamond League meeting
    An IAAF Diamond League meeting is an elite, annual track and field competition that forms part of a global series where top athletes earn points toward overall event titles and prize money.
  • D. professional ranking event
    A professional ranking event is an officially sanctioned competition in which participants’ performances directly determine or adjust their standing within an established professional ranking system.
  • E. international badminton tournament
    An international badminton tournament is a large-scale, officially sanctioned competition where elite players or national teams from multiple countries compete in structured matches to determine champions across various event categories.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86dae698881908327ef2d67706cb9 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:57 a.m.