Triple

T16052710
Position Surface form Disambiguated ID Type / Status
Subject State Atomic Energy Corporation Rosatom E389395 entity
Predicate instanceOf P0 FINISHED
Object nuclear energy company C14601 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear energy company
Context triple: [State Atomic Energy Corporation Rosatom, instanceOf, nuclear energy company]
  • A. nuclear industry company chosen
    A nuclear industry company is an organization that designs, builds, operates, or services nuclear facilities and technologies for energy production, research, medicine, or defense while managing strict safety, regulatory, and environmental requirements.
  • B. energy infrastructure company
    An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
  • C. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • D. multinational utility company
    A multinational utility company is a large-scale enterprise that provides essential services such as electricity, gas, water, or telecommunications across multiple countries, operating under diverse regulatory, cultural, and market conditions.
  • E. integrated energy company
    An integrated energy company is a business that operates across multiple stages of the energy value chain—such as exploration, production, refining, distribution, and retail—often spanning both fossil fuels and renewable energy sources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86dae698881908327ef2d67706cb9 completed April 10, 2026, 3:25 a.m.
Created at: April 10, 2026, 4:56 a.m.