Triple

T16028008
Position Surface form Disambiguated ID Type / Status
Subject 北の丸公園 E388767 entity
Predicate 主な施設 P120217 FINISHED
Object 日本武道館 E270270 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 日本武道館 | Statement: [北の丸公園, 主な施設, 日本武道館]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 日本武道館
Context triple: [北の丸公園, 主な施設, 日本武道館]
  • A. Nippon Budokan chosen
    Nippon Budokan is a famous indoor arena in central Tokyo best known for hosting martial arts events and major concerts by both Japanese and international artists.
  • B. Tokyo Metropolitan Gymnasium
    Tokyo Metropolitan Gymnasium is a prominent modern sports complex in Tokyo, Japan, renowned for its distinctive contemporary architecture and role as a major venue for national and international sporting events.
  • C. Ryōgoku Kokugikan
    Ryōgoku Kokugikan is Tokyo’s main indoor sumo arena, famous as the spiritual home of professional sumo and a venue for major tournaments and cultural events.
  • D. Korakuen Hall
    Korakuen Hall is a famous indoor arena in Tokyo, Japan, best known for hosting professional wrestling, boxing, and martial arts events.
  • E. 新国立競技場
    新国立競技場は、東京オリンピック・パラリンピック2020のメイン会場として建設された、東京都新宿区と渋谷区にまたがる日本の国立競技場です。
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: 主な施設
Context triple: [北の丸公園, 主な施設, 日本武道館]
  • A. isMainBuildingOf
    Indicates that a building serves as the primary or central facility associated with a particular organization, complex, or site.
  • B. isPrimaryFacilityFor
    Indicates that one facility serves as the main or principal location responsible for supporting or serving a particular entity or operation.
  • C. mainFacilityConstructed
    Indicates that the primary facility associated with an entity has been built or completed.
  • D. isMajorFacilityOn chosen
    Indicates that a facility is a primary or significant installation located on or associated with a particular entity or site.
  • E. primaryFacilityType
    Indicates the main or predominant type or category of facility associated with an entity.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86dada3808190825d5f80d72fbe88 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e1858a00888190b8505071575dc56f completed April 17, 2026, 12:57 a.m.
NED1 Entity disambiguation (via context triple) batch_69ffcf33c6a881909284933ea3b7dd6e completed May 10, 2026, 12:20 a.m.
PD Predicate disambiguation batch_69e1826a4f7c8190aba6d4f1075141b0 completed April 17, 2026, 12:44 a.m.
Created at: April 10, 2026, 4:56 a.m.