Triple

T16026472
Position Surface form Disambiguated ID Type / Status
Subject Hyundai Elantra E388729 entity
Predicate isStillInProduction P64427 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Hyundai Elantra, isStillInProduction, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isStillInProduction
Context triple: [Hyundai Elantra, isStillInProduction, true]
  • A. hasProductionStatus chosen
    Indicates the current stage or condition of an entity’s production process (e.g., planned, in progress, completed, or discontinued).
  • B. hasProduction
    Indicates that an entity is associated with, or responsible for, the creation or manufacture of another entity or product.
  • C. currentProduction
    Indicates that an entity is presently engaged in producing, manufacturing, or generating another entity or output.
  • D. mainProductionState
    Indicates the primary state or region where the production of something (e.g., a product, work, or content) predominantly takes place.
  • E. usesProductionModel
    Indicates that one entity employs or relies on another entity as its primary or official production model in practice.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86dada3808190825d5f80d72fbe88 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e1858a00888190b8505071575dc56f completed April 17, 2026, 12:57 a.m.
PD Predicate disambiguation batch_69e1826a4f7c8190aba6d4f1075141b0 completed April 17, 2026, 12:44 a.m.
Created at: April 10, 2026, 4:56 a.m.