Triple
T1601756
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Meaningful Connectivity framework |
E34408
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | connectivity measurement framework |
C8283
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: connectivity measurement framework Context triple: [Meaningful Connectivity framework, instanceOf, connectivity measurement framework]
-
A.
mobility management protocol
A mobility management protocol is a set of rules and procedures that enables devices to maintain seamless network connectivity and consistent addressing while moving across different networks or access points.
-
B.
Wi‑Fi security certification program
A Wi‑Fi security certification program is a formal framework that evaluates, validates, and labels wireless networks and devices against defined security standards to ensure safe and trustworthy Wi‑Fi usage.
-
C.
network connector
A network connector is a component that establishes, maintains, and manages communication links between devices or systems within a network.
-
D.
wireless communication device
A wireless communication device is an electronic apparatus that transmits and receives data over radio or other non-wired signals to enable voice, text, or multimedia communication without physical connections.
-
E.
telecommunications infrastructure component
A telecommunications infrastructure component is a physical or virtual element—such as cables, antennas, switches, or routers—that enables the transmission, routing, and management of voice, data, and multimedia communications across networks.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885fea6a481909fe83ba6441f1774 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:28 p.m.