Triple

T16007029
Position Surface form Disambiguated ID Type / Status
Subject Coso volcanic field E388244 entity
Predicate geothermalPowerCapacity P53312 FINISHED
Object approximately 270 megawatts LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 270 megawatts | Statement: [Coso volcanic field, geothermalPowerCapacity, approximately 270 megawatts]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: geothermalPowerCapacity
Context triple: [Coso volcanic field, geothermalPowerCapacity, approximately 270 megawatts]
  • A. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • B. totalElectricalCapacity_MWe chosen
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • C. hasGeothermalPotential
    Indicates that an entity possesses conditions suitable for generating or exploiting geothermal energy.
  • D. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • E. thermalPower
    Indicates the amount of heat energy per unit time that a system, device, or process generates, transfers, or consumes.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86dabcb7c8190b6a39d6831d2fa1b completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e173b3bf6c81909230170e833d7ce7 completed April 16, 2026, 11:41 p.m.
PD Predicate disambiguation batch_69e142dc081c819082527e3fa8773460 completed April 16, 2026, 8:13 p.m.
Created at: April 10, 2026, 4:55 a.m.