Triple

T15998074
Position Surface form Disambiguated ID Type / Status
Subject Brownsville, Kentucky E388023 entity
Predicate hasHighway P385 FINISHED
Object Kentucky Route 259 E942668 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kentucky Route 259 | Statement: [Brownsville, Kentucky, hasHighway, Kentucky Route 259]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kentucky Route 259
Context triple: [Brownsville, Kentucky, hasHighway, Kentucky Route 259]
  • A. Kentucky Route 259 chosen
    Kentucky Route 259 is a state highway in Kentucky that runs generally north–south, connecting several rural communities and serving as a regional connector route.
  • B. Kentucky Route 237
    Kentucky Route 237 is a state highway in northern Kentucky that serves as a key local connector through Boone County, including the community of Hebron.
  • C. Kentucky Route 224
    Kentucky Route 224 is a state highway in Kentucky that serves as a regional connector route through central parts of the state, including the town of Upton.
  • D. Kentucky Route 212
    Kentucky Route 212 is a short state highway in northern Kentucky that serves as the primary access road to the Cincinnati/Northern Kentucky International Airport.
  • E. Kentucky Route 29
    Kentucky Route 29 is a state highway in Kentucky that serves as a primary connector through Nicholasville and surrounding areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86daa562c81908aacc179c0fe8fb5 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e157893ebc8190acb75ee05e450fae completed April 16, 2026, 9:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69fff794c8508190a444af7ce968c5da completed May 10, 2026, 3:12 a.m.
Created at: April 10, 2026, 4:55 a.m.