Triple
T15988371
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | East bank development |
E387757
|
entity |
| Predicate | followsPlanOf |
P55040
|
FINISHED |
| Object | Sabarmati Riverfront Development Project |
E85396
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sabarmati Riverfront Development Project | Statement: [East bank development, followsPlanOf, Sabarmati Riverfront Development Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Sabarmati Riverfront Development Project Context triple: [East bank development, followsPlanOf, Sabarmati Riverfront Development Project]
-
A.
Pune riverfront development project
The Pune riverfront development project is an urban revitalization initiative aimed at transforming the banks of the Mutha River into accessible, landscaped public spaces with improved infrastructure, recreation, and environmental management.
-
B.
Sabarmati Riverfront
chosen
Sabarmati Riverfront is a major urban waterfront development along the Sabarmati River in Ahmedabad, featuring promenades, parks, cultural spaces, and recreational facilities.
-
C.
Sabarmati Riverfront Development Corporation Limited
Sabarmati Riverfront Development Corporation Limited is a special purpose company established by the Ahmedabad Municipal Corporation to plan, execute, and manage the urban redevelopment and riverfront project along the Sabarmati River in Ahmedabad, India.
-
D.
Kalpasar project
The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
-
E.
Delhi–Mumbai Industrial Corridor Project
The Delhi–Mumbai Industrial Corridor Project is a major infrastructure and industrial development initiative in India aimed at creating a high-tech manufacturing and logistics belt between Delhi and Mumbai.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: followsPlanOf Context triple: [East bank development, followsPlanOf, Sabarmati Riverfront Development Project]
-
A.
followsPlanType
Indicates that one entity adheres to, or is carried out according to, a specified type of plan.
-
B.
followsRouteOf
Indicates that one entity travels along the same path or route that another entity takes or has taken.
-
C.
followsWillOf
Indicates that one entity acts in accordance with, or submits its decisions and behavior to, the intentions, desires, or directives of another entity.
-
D.
followsObjective
chosen
Indicates that one entity pursues, adheres to, or acts in accordance with the goal, plan, or objective defined by another entity.
-
E.
partOfPlan
Indicates that one entity is included as a component or step within a broader plan or strategy.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86daa562c81908aacc179c0fe8fb5 |
completed | April 10, 2026, 3:25 a.m. |
| NER | Named-entity recognition | batch_69e17d4e871c819082d7b1c1eaf5b4fe |
completed | April 17, 2026, 12:22 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ffcf1cb1388190b1ebccc6705e5974 |
completed | May 10, 2026, 12:19 a.m. |
| PD | Predicate disambiguation | batch_69e142d9d8e881909b559a3e3ca21d24 |
completed | April 16, 2026, 8:13 p.m. |
Created at: April 10, 2026, 4:54 a.m.