Triple

T15988371
Position Surface form Disambiguated ID Type / Status
Subject East bank development E387757 entity
Predicate followsPlanOf P55040 FINISHED
Object Sabarmati Riverfront Development Project E85396 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sabarmati Riverfront Development Project | Statement: [East bank development, followsPlanOf, Sabarmati Riverfront Development Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sabarmati Riverfront Development Project
Context triple: [East bank development, followsPlanOf, Sabarmati Riverfront Development Project]
  • A. Pune riverfront development project
    The Pune riverfront development project is an urban revitalization initiative aimed at transforming the banks of the Mutha River into accessible, landscaped public spaces with improved infrastructure, recreation, and environmental management.
  • B. Sabarmati Riverfront chosen
    Sabarmati Riverfront is a major urban waterfront development along the Sabarmati River in Ahmedabad, featuring promenades, parks, cultural spaces, and recreational facilities.
  • C. Sabarmati Riverfront Development Corporation Limited
    Sabarmati Riverfront Development Corporation Limited is a special purpose company established by the Ahmedabad Municipal Corporation to plan, execute, and manage the urban redevelopment and riverfront project along the Sabarmati River in Ahmedabad, India.
  • D. Kalpasar project
    The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
  • E. Delhi–Mumbai Industrial Corridor Project
    The Delhi–Mumbai Industrial Corridor Project is a major infrastructure and industrial development initiative in India aimed at creating a high-tech manufacturing and logistics belt between Delhi and Mumbai.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: followsPlanOf
Context triple: [East bank development, followsPlanOf, Sabarmati Riverfront Development Project]
  • A. followsPlanType
    Indicates that one entity adheres to, or is carried out according to, a specified type of plan.
  • B. followsRouteOf
    Indicates that one entity travels along the same path or route that another entity takes or has taken.
  • C. followsWillOf
    Indicates that one entity acts in accordance with, or submits its decisions and behavior to, the intentions, desires, or directives of another entity.
  • D. followsObjective chosen
    Indicates that one entity pursues, adheres to, or acts in accordance with the goal, plan, or objective defined by another entity.
  • E. partOfPlan
    Indicates that one entity is included as a component or step within a broader plan or strategy.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86daa562c81908aacc179c0fe8fb5 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e17d4e871c819082d7b1c1eaf5b4fe completed April 17, 2026, 12:22 a.m.
NED1 Entity disambiguation (via context triple) batch_69ffcf1cb1388190b1ebccc6705e5974 completed May 10, 2026, 12:19 a.m.
PD Predicate disambiguation batch_69e142d9d8e881909b559a3e3ca21d24 completed April 16, 2026, 8:13 p.m.
Created at: April 10, 2026, 4:54 a.m.