Triple
T15988320
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sabarmati Riverfront Development Corporation Limited |
E387756
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban development corporation |
C36486
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban development corporation Context triple: [Sabarmati Riverfront Development Corporation Limited, instanceOf, urban development corporation]
-
A.
urban development company
chosen
An urban development company is an organization that plans, finances, and executes projects to design, build, and revitalize city spaces, infrastructure, and real estate in alignment with economic, social, and environmental goals.
-
B.
urban-rural development authority
An urban-rural development authority is a governing body responsible for planning, coordinating, and regulating balanced infrastructure, land use, and economic development across both urban and rural areas within its jurisdiction.
-
C.
urban development
Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
-
D.
Mayoral development corporation
A mayoral development corporation is a public body established by a city’s mayor to lead and coordinate regeneration, planning, and economic development within a designated urban area.
-
E.
urban planning department
An urban planning department is a governmental or organizational unit responsible for designing, regulating, and guiding the development and use of land, infrastructure, and public spaces within a city or metropolitan area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86daa562c81908aacc179c0fe8fb5 |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:54 a.m.