Triple

T1598464
Position Surface form Disambiguated ID Type / Status
Subject STS-51L E34336 entity
Predicate precededBy P97 FINISHED
Object STS-61C E166875 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-61C | Statement: [STS-51L, precededBy, STS-61C]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-61C
Context triple: [STS-51L, precededBy, STS-61C]
  • A. STS-61-C chosen
    STS-61-C was a 1986 NASA Space Shuttle Columbia mission notable for carrying future U.S. Senator and NASA Administrator Bill Nelson as a payload specialist.
  • B. STS-61
    STS-61 was a 1993 NASA Space Shuttle Endeavour mission best known for successfully repairing and upgrading the Hubble Space Telescope during a series of complex spacewalks.
  • C. STS-41C
    STS-41C was a 1984 NASA Space Shuttle Challenger mission notable for successfully repairing the Solar Maximum Mission satellite during the first on-orbit satellite repair operation.
  • D. STS-51A
    STS-51A was a 1984 NASA Space Shuttle Discovery mission notable for successfully retrieving and returning two stranded communications satellites from orbit.
  • E. STS-41B
    STS-41B was a 1984 NASA Space Shuttle Challenger mission best known for the first untethered spacewalks using the Manned Maneuvering Unit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885fdcb9c819081ce6f0b8cd477dd completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a9092f5f148190b987bc943e89e29c completed March 5, 2026, 4:40 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad719f91cc8190aaacaa583098732a completed March 8, 2026, 12:54 p.m.
Created at: March 4, 2026, 7:27 p.m.