Triple
T15969643
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Short Knuckleduster (S.1) |
E387286
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental flying boat |
C6075
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental flying boat Context triple: [Short Knuckleduster (S.1), instanceOf, experimental flying boat]
-
A.
experimental aircraft
chosen
An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
-
B.
jet-powered hydroplane
A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
-
C.
shipboard seaplane
A shipboard seaplane is an aircraft designed to operate from water and be launched, recovered, and serviced from a ship, typically for reconnaissance, patrol, or liaison duties at sea.
-
D.
lighter-than-air aircraft
A lighter-than-air aircraft is a vehicle that achieves flight by being buoyant in the air, typically through the use of gases less dense than the surrounding atmosphere, such as helium or hot air.
-
E.
rocket-powered aircraft
A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d86da94ccc819083d187f5dc6a123e |
completed | April 10, 2026, 3:25 a.m. |
Created at: April 10, 2026, 4:54 a.m.