Triple

T15953614
Position Surface form Disambiguated ID Type / Status
Subject Nextel Communications E386876 entity
Predicate networkShutdown P11821 FINISHED
Object 2013 for U.S. iDEN network LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2013 for U.S. iDEN network | Statement: [Nextel Communications, networkShutdown, 2013 for U.S. iDEN network]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: networkShutdown
Context triple: [Nextel Communications, networkShutdown, 2013 for U.S. iDEN network]
  • A. networkCancellation
    Indicates that a previously established network connection, session, or operation has been terminated or called off.
  • B. centerEngineShutdown
    Indicates that the central engine in a multi-engine system has been turned off or has ceased operating.
  • C. shutdownCapability
    Indicates the ability or permission for one entity to power off, deactivate, or terminate the operation of another entity or system.
  • D. permanentShutdown chosen
    Indicates that an entity has been irreversibly taken out of operation and will not be restarted or resumed in the future.
  • E. designedToAllowShutdownOf
    Indicates that one entity is specifically created or configured to enable the shutdown or power-off of another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d86da882448190a82ea962fe343b79 completed April 10, 2026, 3:25 a.m.
NER Named-entity recognition batch_69e17d4d08f481909f38b75e3f42d9ab completed April 17, 2026, 12:22 a.m.
PD Predicate disambiguation batch_69e142d37cd88190ab50760f1783e20c completed April 16, 2026, 8:13 p.m.
Created at: April 10, 2026, 4:53 a.m.